Our agency and technical team carried out extensive space planning and budgeting exercises across multiple properties before securing 15,000 sq ft at the Hallmark Building. A strong commercial deal was negotiated, including a substantial capital contribution to support the fit out. Making Moves Technical led the 9-week CAT B fit out, including demolition of a pre-existing tenant fit out. The design incorporated key requirements such as improved acoustic performance in meeting rooms, upgraded ventilation and temperature control, and a client-facing front-of-house suite with a dedicated utilities room.
Throughout the project, we worked closely with Beat’s in-house IT and AV teams to ensure seamless system integration. Weekly meetings and regular site visits kept the tight programme on track, allowing for quick decision-making and close coordination. The new workspace features high ceilings, a bright and open-plan layout, and a 20-person boardroom – all designed to support Beat’s growing headcount and create a professional, future-facing workplace. Delivered on time and within budget, the new office strikes the right balance between functionality and brand experience, creating a welcoming space for both clients and employees.